Granville, NSW

  • We were contracted to rectify damage done to this factory building by tenants.
  • The building was stripped out and internal surfaces repaired or replaced.
Front view of the building.
Existing partitioning.  Doors were removed and holes cut in between the offices.
Existing partioning and flooring.
Carpets were badly damaged by water.
Existing ceiling tiles and lights and were taped up. The airconditioning ducting was disabled.
Existing kitchenette.
During stripout.
A new ceiling and fresh coat of paint makes a difference.
New kitchenette and linoleum.
New ceiling tiles, flooring, blinds and painted. Air conditioning was replaced.
New ceiling tiles, flooring, blinds and painted. Air conditioning was replaced.